亚洲国产欧美日韩v一区二区-亚洲国产欧美日韩激情在线-亚洲国产欧美日韩精品一区-亚洲国产欧美日韩精品一区二-亚洲国产欧美日韩精品一区二区-亚洲国产欧美日韩另类

Welcome to the official website of Shanghai Industrial Boiler Co., Ltd. / Shanghai Industrial Boiler (Wuxi) Co., Ltd.

Home
TEL:0510-88787772
Application areaEngineering generalcontractor Boiler modificationEquipment installation

Glass industry



The dry quenching technique utilizes a cold inert gas (combusted exhaust gas) to exchange heat with red hot red coke in a dry quenching furnace to cool the red coke. The inert gas that absorbs the heat of the red coke transfers the heat to the dry quenching boiler to generate steam, and the cooled inert gas is then circulated by the circulating fan into the dry extinguishing furnace to cool the red coke. The steam generated by the CDQ boiler is either incorporated into the steam pipe network of the plant or sent to generate electricity. In the reverse movement, the coke is gradually cooled to below 250 ° C, and then discharged by the unloading device at the bottom of the furnace; at the same time, the inert gas (or waste flue gas) is heated to about 800 ° C, passing through the dry quenching ramp After the primary dust collector, the boiler enters the dry quenching boiler; in the boiler, the water is heated by the hot air stream to generate steam, and the gas is cooled to about 200 ° C, and then re-supplied into the dry extinguishing furnace by the circulating fan through the secondary dust removal.
    

 

    
Glass kiln waste heat power generation process flow chart

The dry quenching technique utilizes a cold inert gas (combusted exhaust gas) to exchange heat with red hot red coke in a dry quenching furnace to cool the red coke. The inert gas that absorbs the heat of the red coke transfers the heat to the dry quenching boiler to generate steam, and the cooled inert gas is then circulated by the circulating fan into the dry extinguishing furnace to cool the red coke. The steam generated by the CDQ boiler is either incorporated into the steam pipe network of the plant or sent to generate electricity. In the reverse movement, the coke is gradually cooled to below 250 ° C, and then discharged by the unloading device at the bottom of the furnace; at the same time, the inert gas (or waste flue gas) is heated to about 800 ° C, passing through the dry quenching ramp After the primary dust collector, the boiler enters the dry quenching boiler; in the boiler, the water is heated by the hot air stream to generate steam, and the gas is cooled to about 200 ° C, and then re-supplied into the dry extinguishing furnace by the circulating fan through the secondary dust removal.
2018/08/16 14:44:43 16516

Related documents

Copy right ? 2018 Shanghai Industrial Boiler Co., Ltd.

Record number: Su ICP No. 18041342

主站蜘蛛池模板: 国产亚洲999精品AA片在线爽 | 热伊人99re久久精品最新地 | 2024久久免费精品国产72精品 | 亚洲国产中文综合一区第一页 | 亚洲精品一区二区三区新线路 | 国产亚洲精品久久久久久久 | 久久国产乱子精品免费女 | 亚洲爆乳无码专区 | 丰满少妇被猛烈高清播放 | 国产精品特级毛片一区二区 | 极品美女久久久久久久久久久 | 动漫精品亚洲一区二区 | JIZZ老师护士| 精品少妇无码av无码专区 | 五月丁香综合中文亚洲 | 特级毛片在线大全免费播放 | 国产午夜精品理论片 | 麻豆午夜视频 | 欧美日本在线观看 | 国产亚洲欧美日韩综合另类 | 国产女人与黑人在线播放 | 麻豆视频一区二区 | 国产一区二区精品久久久 | 97无码人妻福利免费公开在线视频 | 精品国产亚洲一区二区在线 | 蜜臀久久99精品久久久久久网站 | 国产欧美va欧美va香蕉在线 | 国产一区二区三不卡高清 | 午夜A级理论片左线播放 | 中文国产成人精品少久久 | 级毛片久久久毛片精品毛片 | 91福利免费视频 | 久久亚洲av无码精品久久久 | 精品一区二区三区在线视频 | 7799天天综合在线 | 精品国产理论在线观看不卡 | 国产欧美日韩在线在线播放 | av在线观看网站免费 | 视频一区久久手机在线 | 欧美亚洲日韩午夜激情影院 | 久久aa毛片免费播放嗯啊 |